General Overview[ | ]
Zinc mines can only be used to gather one specific resource. A zinc mine can only be constructed from a claimed asteroid. These cannot normally be removed from the sector where they originally reside. This is the only existing method to gather zinc. Zinc is used in a few important manufacturing processes.
Station Manufacturing Process[ | ]
Metals produced at this type of mine are used in the following applications:
Zinc
Construction[ | ]
Cost to produce: 14,250,000 credits
Production[ | ]
This mine produces the following resources per cycle:
Name | Quantity | Volume | Avg. Price | Illegal? | Dangerous? |
---|---|---|---|---|---|
Zinc | 10 | 1 | 250 | No | No |
Zinc mines have a default cycle time of 25 seconds which can be reduced to the minimum time of 15 seconds by adding 167 production capacity worth of assembly blocks.
Profitability[ | ]
This mine's profitability is an average of 2500 credits per cycle.
Trivia[ | ]
- Originally named 'Cink Mine'.
List of all Goods